9350WF

Improvement of Water Supply to Sheung Shui and Fanling

Project Scope

  1. construction of a service reservoir at Table Hill with a capacity of 24 000 cubic metres (m3);
  2. laying of two trunk mains of about 1 000 metres (m) in total, with a diameter of 600 millimetres (mm) connecting respectively the existing Sheung Shui water treatment works and Table Hill fresh water service reservoir with the new service reservoir; and
  3. laying of about 1 700 m distribution main of 800 mm in diameter connecting the new service reservoir with the existing fresh water distribution network at Tin Ping Road.

Approved Project Estimate

$521.3 million

Construction Commencement Date

September 2016

Construction Completion Date

April 2020

Current Progress

Completed

Project Office in WSD

Construction Division

Consultant

Not applicable

Contract

Contract No. 4/WSD/16 - Improvement of Water Supply to Sheung Shui and Fanling
(NEC3 ECC Option D)