9350WF
Improvement of Water Supply to Sheung Shui and Fanling
Project Scope
- construction of a service reservoir at Table Hill with a capacity of 24 000 cubic metres (m3);
- laying of two trunk mains of about 1 000 metres (m) in total, with a diameter of 600 millimetres (mm) connecting respectively the existing Sheung Shui water treatment works and Table Hill fresh water service reservoir with the new service reservoir; and
- laying of about 1 700 m distribution main of 800 mm in diameter connecting the new service reservoir with the existing fresh water distribution network at Tin Ping Road.
Approved Project Estimate
$521.3 million
Construction Commencement Date
September 2016
Construction Completion Date
April 2020
Current Progress
Completed
Project Office in WSD
Construction Division
Consultant
Not applicable
Contract
Contract No. 4/WSD/16 - Improvement of Water Supply to Sheung Shui and Fanling
(NEC3 ECC Option D)
9350WF