Project Scope
- increasing the water treatment capacity of Siu Ho Wan water treatment works (SHW WTW) from 150 000 cubic metres (m3) per day to 300 000 m3 per day within the existing WTW compound, by constructing new water treatment facilities and a new laboratory building and modifying the existing associated facilities;
- constructing a new raw water booster pumping station in Siu Ho Wan to increase the raw water transfer capacity from Tai Lam Chung Reservoir to SHW WTW;
- uprating the existing Pui O raw water pumping station and Pui O No. 2 raw water pumping station to a combined raw water transfer capacity of 460 000 m3 per day; and
- laying approximately 1.2 kilometres of water mains with diameter ranging from 1 200 millimetres (mm) to 1 400 mm along South Lantau Road to increase the raw water transfer capacity from Shek Pik Reservoir to SHW WTW.
Approved Project Estimate
$3,694.9 million
Construction Commencement Date
March 2022
Estimated Construction Completion Date
Fourth quarter of 2027
Current Progress
Construction is in progress
Project Office in WSD
Consultants Management Division
Consultant
Binnies Hong Kong limited
Contract
- Contract No. 7/WSD/21 - Construction of Siu Ho Wan Water Treatment Works Extension and Siu Ho Wan Raw Water Booster Pumping Station
(NEC4 ECC Option C)
- Contract No. 18/WSD/21 - Uprating of Pui O Raw Water Pumping Station and Pui O No. 2 Raw Water Pumping Station and Laying of Raw Water Mains along South Lantau Road
(NEC4 ECC Option D)