Siu Ho Wan water treatment works extension – main works

Project Scope

  1. increasing the water treatment capacity of Siu Ho Wan water treatment works (SHW WTW) from 150 000 cubic metres (m3) per day to 300 000 m3 per day within the existing WTW compound, by constructing new water treatment facilities and a new laboratory building and modifying the existing associated facilities; 
  2. constructing a new raw water booster pumping station in Siu Ho Wan to increase the raw water transfer capacity from Tai Lam Chung Reservoir to SHW WTW; 
  3. uprating the existing Pui O raw water pumping station and Pui O No. 2 raw water pumping station to a combined raw water transfer capacity of 460 000 m3 per day; and 
  4. laying approximately 1.2 kilometres of water mains with diameter ranging from 1 200 millimetres (mm) to 1 400 mm along South Lantau Road to increase the raw water transfer capacity from Shek Pik Reservoir to SHW WTW. 

Approved Project Estimate

$3,694.9 million 

Construction Commencement Date

March 2022 

Estimated Construction Completion Date

Fourth quarter of 2027 

Current Progress

Construction is in progress 

Project Office in WSD

Consultants Management Division 

Consultant

Binnies Hong Kong limited 

Contract

(NEC4 ECC Option C)