B126WC
Water Supply to Housing Development at Anderson Road
Project Scope
- Construction of a fresh water pumping station at Sau Mau Ping Road with a pumping capacity of 22 000 m3/day;
- Construction of a fresh water service reservoir at Anderson Road with a capacity of 12 000 m3;
- Construction of a salt water service reservoir at Anderson Road with a capacity of 2 800 m3;
- Laying of approximately 2 km of fresh and salt water mains with sizes ranging from 300 mm to 900 mm in diameter;
- Installation of additional salt water pumps with a pumping capacity of 5 200 m3/day in the existing Shum Wan Shan salt water pumping station; and
- Installation of additional fresh water pumps with a pumping capacity of 22 000 m3/day in the existing Shum Wan Shan fresh water pumping station.
Approved Project Estimate
$231.5 million
Construction Commencement Date
November 2011
Construction Completion Date
February 2015
Current Progress
Completed
Project Office in WSD
Design Division
Consultant
AECOM Asia Co. Ltd.
Contract
Contract No. 6/WSD/11
B126WC