Jump to the beginning of content

B126WC

Water Supply to Housing Development at Anderson Road

Project Scope

  1. Construction of a fresh water pumping station at Sau Mau Ping Road with a pumping capacity of 22 000 m3/day;
  2. Construction of a fresh water service reservoir at Anderson Road with a capacity of 12 000 m3;
  3. Construction of a salt water service reservoir at Anderson Road with a capacity of 2 800 m3;
  4. Laying of approximately 2 km of fresh and salt water mains with sizes ranging from 300 mm to 900 mm in diameter;
  5. Installation of additional salt water pumps with a pumping capacity of 5 200 m3/day in the existing Shum Wan Shan salt water pumping station; and
  6. Installation of additional fresh water pumps with a pumping capacity of 22 000 m3/day in the existing Shum Wan Shan fresh water pumping station.

Approved Project Estimate

$231.5 million

Construction Commencement Date

November 2011

Construction Completion Date

February 2015

Current Progress

Completed

Project Office in WSD

Design Division

Consultant

AECOM Asia Co. Ltd.

Contract

Contract No. 6/WSD/11