Laying of about 4 800 metres (m) of fresh water mains of diameters ranging from 300 millimetres (mm) to 900 mm; and laying of about 4 800 m of salt water mains of diameters ranging from 150 mm to 400 mm.
$103.8 million
January 2008
August 2015
Completed
Construction Division
Not applicable
The proposed mainlaying works was incorporated into the site formation and associated infrastructure contract carried out by CEDD under 566CL.