Consultancies Awarded

Position as at 18.11.2024

2024

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 11/2024 (WS) Conversion from Fresh Water to Salt Water for Flushing – Stage 2 – Design and Construction AECOM Asia Company Limited $10,080,000 18/11/2024 17/6/2029
CE 2/2024 (GE) Engineer Inspections, Preventive Maintenance Works and Upgrading Works for Water Supplies Department Slopes in Kowloon Region and New Territories West Region, 2024-2027 Programme – Investigation, Design and Construction C M Wong & Associates Limited $20,200,000.00 11/11/2024 10/5/2031
CE 1/2024 (GE) Engineer Inspections, Preventive Maintenance Works and Upgrading Works for Water Supplies Department Slopes in Hong Kong & Islands Region and New Territories East Region, 2024-2027 Programme – Investigation, Design and Construction Asia Infrastructure Solutions Limited $14,500,00.00 11/11/2024 10/5/2031
CE 16/2024 (EM) Implementation of Sodium Hypochlorite Solution Dosing System at Salt Water Pumping Stations – Investigation, Design and Construction Ove Arup & Partners Hong Kong Limited $5,400,288 4/11/2024 3/3/2029
CE 3/2023 (WS) Supply of Reclaimed Water to Tin Shui Wai, Yuen Long Town and Tuen Mun – Yuen Long Corridor – Investigation, Design and Construction Binnies Hong Kong Limited $25,000,000.00 7/2/2024 6/1/2034
CE 47/2023 (WS) Improvement of Water Supply to Northern New Territories – Investigation, Design and Construction Asia Infrastructure Solutions Limited $11,800,000 19/1/2024 18/7/2031

2023

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 47/2023 (WS)

Improvement of Water Supply to Northern New Territories – Investigation, Design and Construction

Asia Infrastructure Solutions Limited $11,800,000 19/1/2024 18/7/2031
CE 60/2022 (WS)

Risk-Based Improvement of Water Mains on Hong Kong & Islands and New Territories West (2024 - 2029) – Investigation, Design and Construction

Binnies Hong Kong Limited $18,000,000 17/10/2023 16/7/2031
CE 61/2022 (WS)

Risk-Based Improvement of Water Mains in Kowloon and New Territories East (2024 - 2029) – Investigation, Design and Construction

AECOM Asia Company Limited $13,680,000 17/10/2023 16/7/2031
CE 11/2023(WS) Installation of Master Meters in Small Housing Estates - Investigation, Design and Construction Binnies Hong Kong Limited $18,000,000.00 10/10/2023 09/06/2028
CE 18/2023 (WS) Mid-term Review of Total Water Management Strategy – Feasibility Study Atkins China Limited $10,955,700.00 28/07/2023 27/01/2025
CE 82/2022 (WS) In-situ Reprovisioning of Tsuen Wan Water Treatment Works – Investigation, Design and Construction Binnies Hong Kong Limited $48,000,000.00 19/06/2023 18/06/2038
CE 92/2022 (WS) Second Stage of Desalination Plant at Tseung Kwan O – Investigation, Design and Construction Binnies Hong Kong Limited $43,800,000.00 02/06/2023 01/01/2031
CE 44/2022 (WS) Implementation of Water Intelligent Network on Salt Water Network - Feasibility Study Mannings (Asia) Consultants Limited $5,880,000 28/04/2023 27/10/2024
CE 62/2022 (WS) Laying of Fresh Water Trunk Mains from Ngau Tam Mei Fresh Water Primary Service Reservoir to Tan Kwai Tsuen and Modification of Raw Water Tunnel Junction (Chamber G) - Design and Construction Ove Arup & Partners Hong Kong Limited $33,000,330.00 14/04/2023 13/01/2036
CE 65/2022 (WS)  On-condition Monitoring and Identification of Improvement Works for Water Supplies Department Water Tunnels and Associated Facilities - Investigation Ove Arup & Partners Hong Kong Limited $10,559,500.00 01/03/2023 31/08/2026
CE 39/2022 (EM) Implementation of a Large Scale Solar Farm at South East New Territories Landfill for Supplying Renewable Energy to the Tseung Kwan O Desalination Plant - Investigation, Design and Construction Binnies Hong Kong Limited $14,500,000 21/02/2023 20/10/2028
CE 27/2022 (WS) Examination and Report on the Safety of Reservoirs – Tenth Formal Independent Inspection and Advisory Services, Package A – Investigation  Binnies Hong Kong Limited $19,846,100 03/01/2023 03/01/2028
CE 28/2022 (WS) Examination and Report on the Safety of Reservoirs – Tenth Formal Independent Inspection and Advisory Services, Package B – Investigation  Ove Arup & Partners Hong Kong Limited $17,502,300 03/01/2023 03/01/2028

2022

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 2/2022 (WS)

Water Loss Investigation for Water Intelligent Network in New Territories East Region - Investigation

Mannings (Asia) Consultants Limited $6,404,000

14/10/2022

13/10/2024

CE 87/2021 (WS)

Relocation of Tsuen Wan No. 2 Fresh Water Service Reservoir to Caverns – Investigation, Design and Construction

Atkins China Limited $23,856,830.00

15/06/2022

15/01/2032

CE 40/2021 (WS)

Advisory Services on New Engineering Contract (NEC) at Construction Stage for Priced Contracts - Design and Construction

Meinhardt Infrastructure and Environment Limited $10,240,560

30/09/2022

31/05/2025

CE 43/2022 (WS)

Relocation of Tsing Yi East Group Fresh Water and Salt Water Service Reservoirs and Shau Kei Wan Low Level Salt Water Service Reservoir to Caverns – Feasibility Study

AECOM Asia Company Limited $19,880,000.00

14/10/2022

13/08/2024

CE 23/2022 (WS)

Use of Recycled Water in District Cooling Systems in Hong Kong – Feasibility Study

Binnies Hong Kong Limited $6,300,000

23/09/2022

22/03/2024

CE 55/2021 (WS)

Implementation of a Large Scale Floating Solar Farm at Plover Cove Reservoir – Investigation, Design and Construction 

Binnies Hong Kong Limited $13,000,000

08/08/2022

07/06/2027

CE 88/2021 (WS)

Relocation of Yau Tong Group Fresh Water and Salt Water Service Reservoirs to Caverns – Investigation, Design and Construction

Binnies Hong Kong Limited $23,800,000 15/06/2022 14/01/2032
CE 83/2021 (WS)

Application of On-Site Storage for Water Supply Systems in Hong Kong - Feasibility Study

WSP (Asia) Limited $6,180,000

08/08/2022

07/11/2023

CE 82/2021 (WS)

Improvement of Raw Water Supply to North Lantau by Laying a Duplicated Raw Water Main from Tai Lam Chung to North Lantau – Feasibility Study

Mannings (Asia) Consultants Ltd $4,291,200

14/07/2022

13/10/2023

CE 66/2021 (WS)

Improvement Works to Fresh Water Mains with Internal Bitumen Lining – First Package of High Priority Mains in Hong Kong & Islands and Kowloon - Investigation, Design and Construction

Binnies Hong Kong Limited $14,800,000 21/04/2022 20/01/2033
CE67/2021(WS)

Improvement Works to Fresh Water Mains with Internal Bitumen Lining – First Package of High Priority Mains in New Territories East and New Territories West - Investigation, Design and Construction

AECOM Asia Company Limited $10,080,000 21/04/2022 20/01/2033
CE 61/2021(WS)

Conversion from Fresh Water to Salt Water for Flushing - Investigation, Design and Construction

Binnies Hong Kong Limited $18,000,000 25/02/2022 24/10/2025
CE 79/2020 (WS)

Modification of the Existing Raw Water Tunnel Junction (Chamber G) Located Near Ngau Tam Mei Water Treatment Works–Investigation

Meinhardt Infrastructure and Environment Limited $5,302,638 10/1/2022 09/04/2023

2021

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 12/2021 (WS)

Relocation of Tuen Mun Water Treatment Works to Cavern – Feasibility Study

Binnies Hong Kong Limited $9,000,000 28/10/2021 27/10/2024
CE 82/2020 (WS) Improvement of the Resilience of Water Supplies Department Critical Infrastructures to cater for Effects of Climate Change and Extreme Weather Conditions – Investigation AECOM Asia Company Limited $6,880,000 20/09/2021 19/09/2023
CE 80/2020 (WS) Laying of fresh water trunk mains from the Ngau Tam Mei Fresh Water Primary Service Reservoir to Tan Kwai Tsuen – Investigation WSP (Asia) Limited $5,008,920 30/08/2021 29/11/2022
CE 81/2020 (EP) Investigation on Asbestos Containing Materials in Water Supplies Department’s Premises - Investigation Binnies Hong Kong Limited $7,380,000 26/07/2021 25/07/2024
CE 78/2020 (WS) Ngau Tam Mei Water Treatment Works and Primary Service Reservoir Extension – Investigation, Design and Construction Ove Arup & Partners Hong Kong Limited $33,001,738 15/06/2021 14/02/2032

2020

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 3/2020(WS) Advisory Services on New Engineering Contract (NEC) at Construction Stage for Priced Contract and Target Contract - Design and Contruction Meinhardt Infrastructure and Environment Ltd $8,676,560 22/12/2020 21/05/2024
CE 65/2019 (WS) Risk-Based Improvement of Water Mains in Kowloon and New Territories East – Investigation, Design and Construction AECOM Asia Company Limited $9,018,000 17/04/2020 16/07/2024
CE 64/2019 (WS) Risk-Based Improvement of Water Mains on Hong Kong & Islands and New Territories West – Investigation, Design and Construction Black & Veatch Hong Kong Limited $8,800,000 17/04/2020 16/07/2024
CE 5/2019 (EP) Independent Environmental Checker for First Stage of Tseung Kwan O Desalination Plant - Investigation ANewR Consulting Limited $2,000,000 29/01/2020 28/08/2023

2019

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 39/2018 (WS) Strategic Cavern Areas to Accommodate Existing and Proposed Service Reservoirs in Lam Tei and Adjoining Areas - Feasibility Study Black & Veatch Hong Kong Limited $11,000,000 02/07/2019 02/07/2021
CE 9/2018 (WS) Tackling Detachment of Internal Bitumen Lining in Fresh Water Mains - Investigation Black & Veatch Hong Kong Limited $4,950,000 01/02/2019 30/09/2021
CE 67/2017(WS) Reclaimed Water Supply to Sheung Shui and Fanling - Investigation, Design and Construction Black & Veatch Hong Kong Limited $15,000,000 21/02/2019 20/03/2027

2018

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 15/2018 (WS) Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns – Investigation, Design and Construction Black & Veatch Hong Kong Limited $30,800,000 31/12/2018 31/01/2027
CE 40/2018 (WS) Ngau Tam Mei Water Treatment Works Extension – Feasibility Study Black & Veatch Hong Kong Limited $5,000,000 31/12/2018 30/09/2020
CE 82/2017 (WS) Siu Ho Wan Water Treatment Works Extension – Investigation, Design and Construction Black & Veatch Hong Kong Limited $54,000,000 20/08/2018 19/02/2029
CE 64/2017(WS) Examination and Report on the Safety of Reservoirs - Ninth Formal Independent Inspection and Advisory Services, Package B - Investigation Ove Arup & Partners Hong Kong Limited $13,443,655 30/04/2018 29/07/2023
CE 63/2017(WS) Examination and Report on the Safety of Reservoirs - Ninth Formal Independent Inspection and Advisory Services, Package A - Investigation Black & Veatch Hong Kong Limited $16,721,070 30/04/2018 29/07/2023

2017

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 37/2017(WS) Relocation of Yau Tong Group Fresh Water and Salt Water Service Reservoirs to Caverns - Feasibility Study Atkins China Limited $10,000,000 29/12/2017 31/12/2020
CE 24/2017(WS) Relocation of Tsuen Wan No. 2 Fresh Water Service Reservoir to Cavern - Feasibility Study Ove Arup & Partners Hong Kong Limited $8,809,514 20/11/2017 31/12/2020
CE 19/2017(WS) Advisory Services on New Engineering Contract (NEC) at Construction Stage for Two Target Contracts - Design and Construction Meinhardt Infrastructure and Environment Ltd $10,039,824 27/11/2017 30/04/2023
CE 17/2017(WS) Advisory Service on New Engineering Contract (NEC) at Construction Stage for Four Priced Contracts - Design and Construction Meinhardt Infrastructure and Environment Ltd $11,171,580 27/11/2017 30/09/2022
CE 21/2017(WS) Conversion from Fresh Water to Salt Water for Flushing in Tuen Mun East, Remaining Areas in Yuen Long and Pok Fu Lam - Design and Construction Mannings (Asia) Consultants Limited $5,312,000 21/11/2017 20/11/2020
CE 62/2016 (WS) Grey Water Treatment Plant for Anderson Road Quarry Development - Investigation, Design and Construction Black & Veatch Hong Kong Limited $8,200,000 22/08/2017 21/12/2024
9OE110 Design and Construction Management for the Water Resources Education Centre at Tin Shui Wai Leigh and Orange Limited $5,335,000 21/02/2017 20/12/2020
CE 18/2016 (GE) Engineer Inspections, Preventive Maintenance Works and Upgrading Works for WSD Slopes, 2016-2017 Programme - Design and Construction Halcrow China Limited $25,999,990 23/01/2017 22/01/2023

2016

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 38/2016 (WS) Implementation of Water Intelligent Network (WIN), Remaining District Metering Areas and Pressure Management Areas in Yuen Long and Sheung Shui & Fanling Major Supply Zones - Investigation, Design and Construction Meinhardt (Hong Kong) Limited $8,135,890 15/12/2016 14/05/2023
CE 37/2016 (WS) Implementation of Water Intelligent Network (WIN), Remaining District Metering Areas and Pressure Management Areas in Kowloon East, Sha Tin and Islands Major Supply Zones - Investigation, Design and Construction Black & Veatch Hong Kong Limited $11,300,000 15/12/2016 14/05/2023
CE 53/2015 (WS) Eighth Safety Review of Small Service Reservoirs - Investigation Black & Veatch Hong Kong Limited $8,948,900 26/04/2016 25/10/2020
CE 34/2015 (WS) Water Supply to New Housing Developments in Sheung Shui and Fanling - Investigation, Design and Construction Atkins China Limited $15,500,000 03/02/2016 02/07/2024
CE 16/2014 (WS) Improvement of Tai Lam Chung (Sections A, C, I&H, K), Shek Pik (Sections E&F), High Island (Section JA1), Tung Tsz (Plover Cove) and Tai Mei Tuk Catchwater Systems - Feasibility Study SMEC Asia Limited $2,405,828 20/01/2016 30/09/2021

2015

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 2/2015 (WS) Implementation of Water Intelligent Network (WIN), Advance Package - Investigation, Design and Construction Black & Veatch Hong Kong Limited $7,500,000 27/08/2015 02/08/2025
CE 8/2015 (WS) First Stage of Desalination Plant at Tseung Kwan O - Investigation, Design and Construction Black & Veatch Hong Kong Limited $180,000,000 16/11/2015 15/10/2023

2014

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 2/2014 (WS) Review of Total Water Management Strategy in Hong Kong - Feasibility Study Black & Veatch Hong Kong Limited $12,000,000 29/10/2014 30/11/2020

2013

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 15/2012 (GE) Engineer Inspections, Preventive Maintenance Works and Upgrading Works for WSD Slopes 2012 - 2013 Programme - Design and Construction Halcrow China Limited $20,024,160 12/03/2013 06/01/2021

2012

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 50/2011 (WS) Examination and Report on the Safety of Reservoirs - Eighth Formal Independent Inspection and Advisory Services - Investigation AECOM Asia Company Limited $15,590,750 15/08/2012 30/12/2020
CE 42/2011 (WS) Implementation of Pressure Management and District Metering for the Fresh Water Distribution Systems of the Tsuen Wan West, Tuen Mun, Sai Kung, Aberdeen and Red Hill Major Supply Zones – Design and Construction Black & Veatch Hong Kong Limited $4,950,000 13/04/2012 02/08/2025

2011

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 52/2009 (WS) Improvement of fresh water supply to Cheung Chau - Design and Construction Black & Veatch Hong Kong Limited $5,420,000 03/01/2011 31/12/2020

2010

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 13/2009 (WS) In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works - Design and Construction AECOM Asia Company Limited $100,800,000 23/08/2010 15/09/2028

2009

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 26/2009 (WS) Improvement of Shing Mun, Beacon Hill, Golden Hill and Tai Lam Chung (Sections L, M, N & O) Catchwater Systems - Investigation, Design and Construction AECOM Asia Co. Ltd. $17,900,000 01/12/2009 31/12/2020
CE 58/2008 (WS) Integration of Ma On Shan and Pak Kong Fresh Water Supply Systems - Investigation, Design and Construction AECOM Asia Co. Ltd. $3,982,250 08/09/2009 Under suspension
CE 55/2008 (WS) Expansion of Tai Po Water Treatment Works and Ancillary Raw Water and Fresh Water Transfer Facilities - Design and Construction Black & Veatch Hong Kong Limited $70,000,000 05/06/2009 25/02/2021

2008

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 11/2008 (WS) Replacement and Rehabilitation of Water Mains Stage 4, Mains on Hong Kong and Islands - Investigation, Design and Construction Metcalf & Eddy Limited $7,995,190 28/12/2008 31/12/2020
CE 10/2008 (WS) Replacement and Rehabilitation of Water Mains Stage 4, Mains in New Territories – Investigation, Design and Construction Black & Veatch Hong Kong Limited $10,000,000 26/09/2008 31/12/2020
CE 12/2008 (WS) Replacement and Rehabilitation of Water Mains Stage 4 - Mains in Kowloon and Ring Mains for Cheung Sha Wan Salt Water Supply System - Investigation, Design and Construction AECOM Asia Co. Ltd. $8,702,000 24/09/2008 31/12/2020

2006

Agreement No. (1) Agreement Title Name of Successful Consultant Consultancy
Cost (2)
Commencement Date Estimated Completion Date
CE 25/2006 (WS) Replacement and Rehabilitation of Water Mains Stage 3 - Mains in Kowloon - Investigation, Design and Construction Atkins China Limited $8,001,000 08/12/2006 31/12/2020
CE 24/2006 (WS) Replacement and Rehabilitation of Water Mains Stage 3 - Mains in New Territories - Investigation, Design and Construction AECOM CDM Joint Venture $4,138,800 31/10/2006 31/10/2020

Notes:

  1. Consultancies which have been completed will not be included in the tables above.
  2. It refers to the lump sum fee or estimated fee.