No. | Title | Revision | File Size |
---|---|---|---|
0.1 | Table of Contents | 12 | 11KB |
0.2 | Revision Sheet | 52 | 227KB |
0.3 | Distribution List | 4 | 19KB |
0.4 | Glossary | 0 | - |
GENERAL | |||
M-00-03 | General Specification for Supply of Mechanical Plant | changed to EM-00-03 (Volume IV) | - |
28.2.2005 | 1.95MB | ||
CENTRIFUGAL PUMPS | |||
M-01-01 | Centrifugal Pumps | 15.4.2020 | 348KB |
31.7.2017 | 118KB | ||
12.4.2012 | 676KB | ||
28.7.2010 | 631KB | ||
23.6.2009 | 341KB | ||
M-01-04 | Submersible Borehole Pumps | 14.3.2016 | 31KB |
Submersible Borehole Multistage Pumps | 12.11.2009 | 170KB | |
Submersible multistage pumps for Borehole and above ground applications | 1.4.2003 | 23KB | |
M-01-05 | Multistage Centrifugal Pumps and Associated Equipment | 24.1.2024 | 270KB |
Multistage Centrifugal Pumps and Associated Equipment | 16.6.2016 | 169KB | |
Multistage Centrifugal Pumps and Associated Equipment for Village Fresh Water Supply | 28.12.2015 | 33KB | |
Centrifugal Multistage Pumps and Associated Equipment for Village Fresh Water Supply | 12.11.2009 | 464KB | |
Centrifugal Multistage Pumps for Village Fresh Water Supply | 1.4.2003 | 110KB | |
M-01-06 | Chlorinator Water Supply Booster Pumps | Combined to M-01-05 | - |
18.2.2016 | 31KB | ||
13.2.2009 | 230KB | ||
VALVES AND PIPEWORK | |||
M-02-01 | Valves | 16.11.2018 | 215KB |
28.6.2016 | 84KB | ||
11.12.2014 | 77KB | ||
1.2.2008 | 468KB | ||
M-02-02 | Mild Steel Pipework (for Pressure Rating of PN 16 and PN 25) | 4.6.2019 | 168KB |
16.6.2011 | 796KB | ||
23.4.2009 | 261KB | ||
M-02-03 | Stainless Steel Pipework (for Pressure Rating of PN 16 and PN 25) | 1.2024 | 342KB |
11.2018 | 138KB | ||
28.4.2011 | 210KB | ||
PORTABLE EQUIPMENT | |||
M-05-01 | Submersible Dewatering Pumps | 19.1.2016 | 38KB |
12.11.2009 | 220KB | ||
Submersible Pumps | 1.4.2003 | 17KB | |
CHLORINATION PLANT AND EQUIPMENT | |||
M-06-03 | Chlorine Absorber System | changed to EM-02-12 (Volume IV) | - |
20.10.2005 | 1.04MB | ||
M-06-04 | Piping, Valves and Accessories for Chlorination Plant | changed to EM-02-11 (Volume IV) | - |
1.3.2004 | 22KB | ||
M-06-05 | Supply of Liquid Chlorine Containers | Cancelled in 2.2024 | - |
29.2.2016 | 538KB | ||
8.7.2010 | 1.8MB | ||
Liquid Chlorine Containers | 21.10.2008 | 624KB | |
AIR COMPRESSOR | |||
M-07-01 | Motor-driven Air Compressor Up to 40 kW for Indoor Installation | 12.2023 | 346KB |
1.9.2017 | 26KB | ||
8.11.2011 | 453KB | ||
28.3.2006 | 471KB | ||
MISCELLANEOUS | |||
M-09-01 | Glassfiber Reinforced Polyester Intake Screens | 12.2022 | 3360KB |
2.2014 | 168KB | ||
25.7.2008 | 236KB | ||
M-09-02 | Coated Stainless Steel Intake Screens | 12.2022 | 886KB |
2.2014 | 508KB |