Financial Year (Percentage) | |||
Indicators | 11/12 | 12/13 | 13/14 |
---|---|---|---|
Fresh Water Quality [100% compliant with WHO’s “Guidelines for Drinking-water Quality”(2011#)] | 100 | 100 | 100 |
Salt Water Quality [96% compliant with WSD Water Quality Objectives] | complied with | complied with | complied with |
Fresh Water Supply Pressure (15 – 30 metres)λ | 100 | 100 | 100 |
Salt Water Supply Pressure (15 metres)λ | 100 | 100 | 100 |
Financial Year (Percentage) | |||
Indicators | 11/12 | 12/13 | 13/14 |
---|---|---|---|
Response Time for Attendance to Fault Complaints
|
99.2 99.8 |
99.97 99.97 |
100 100 |
Duration of Suspension of Water Supply for Planned Works(97% within 8 hours) | complied with | complied with | complied with |
Accuracy of Water Meters@ (inaccuracy not exceeding ±3%) | 95.3 | 96.0 | 96.4* |
Interim Reply to Correspondence from the Public (10 Calendar Days) | 98.2 | 99.9 | 99.96 |
Fresh Water Quality, Fresh Water Supply Pressure, Salt Water Supply Pressure Diagram
Response Time for Attendance to Fault Complaints Diagram
Accuracy of Water Meters, Interim Reply to Correspondence from the Public Diagram